UPGRADE aq_mesh1974150 : Replaced PM Pump
19 March 2025 - 28 March 2025
19/03/2025 11:15 Retrieved from Coast Rd back to office to service PM pump and optics system. Pump was found to be very low flow and discarded. (May be salvagable)
26/03/2025 11:15 Swapped pump from out of contract 1977150 (tested, was working)
26/06/2025 17:00 Reinstalled at Coast Road Precision for co-location.
Data during this period should be ignored as pod will rebase.